How We Cut Kubernetes Costs by 50% Without Touching Application Code
Real-world strategies that reduced our clients' cloud bills by $40K+/month: node rightsizing, spot instances, autoscaling fixes, and storage optimization—all infrastructure-level changes.
Most teams accept their Kubernetes bills as "the cost of doing cloud." But in reality, 40-60% of typical K8s spend is waste: over-provisioned nodes, idle resources, inefficient autoscaling, and expensive storage classes. Here's how we consistently cut costs in half without performance trade-offs.
1) Right-size your nodes (start here)
Most clusters run on oversized instances "just to be safe." Use actual resource metrics to pick the optimal instance types.
- ✓Analyze actual CPU/memory usage over 2 weeks (not requests/limits).
- ✓Switch to ARM-based instances (Graviton on AWS) for 20-40% savings.
- ✓Use burstable instances (T-series) for low-traffic workloads.
2) Embrace spot instances for stateless workloads
Spot instances cost 60-90% less than on-demand. With proper pod disruption budgets and node diversity, they're production-ready.
- ✓Use spot for batch jobs, CI/CD workers, and stateless services.
- ✓Mix spot with on-demand using node affinity/taints.
- ✓Set up Karpenter or Cluster Autoscaler spot support.
3) Fix autoscaling before it drains your budget
- ✓Set HPA based on actual traffic patterns, not guesses.
- ✓Enable Cluster Autoscaler with proper node group configs.
- ✓Use scale-down delays to prevent thrashing.
- ✓Monitor scale-up/down events and tune thresholds.
4) Storage optimization (often overlooked)
- ✓Don't use premium SSD for logs or temp data (use gp2/standard).
- ✓Set retention policies on PVCs and delete orphaned volumes.
- ✓Use volume snapshots strategically, not continuously.
5) Resource requests/limits: the hidden cost multiplier
Overly generous requests waste money; missing limits cause noisy neighbors. Get this balance right.
- ✓Use VPA (Vertical Pod Autoscaler) recommendations.
- ✓Set requests = actual usage, limits = 1.5-2x requests.
- ✓Monitor throttling and OOM kills to tune limits.
Ready to Implement This?
Want a custom cost audit? We analyze your cluster usage, identify waste, and implement optimizations—typically delivering 40-60% cost reduction in 2-3 weeks. Reach out for a free assessment.
Book Free ConsultationGet More DevOps Insights
Join 2K+ engineers getting weekly tips on Kubernetes, CI/CD, cost optimization, and platform engineering.
Subscribe to Newsletter